• Text Size:  A   A   A | 
  • Follow us on:
  • Facebook
  • Twitter
  • YouTube
  • RSS Feed | 

Performing Arts Centre

Background Information:

  • Target: LEED Certified
  • Occupancy: summer 2011
  • Location: Southwest corner of Elgin and Locust Streets
  • City of Burlington webpage regarding project

Relevant Reports:

  • Report providing an update on the Burlington Performing Arts Centre construction project. (DI-10-11
  • Burlington Performing Art Centre Update (June 2011) (DI-7-11)
  • Burlington Performing Art Centre Update (January 2011) (DI-1-11, Appendix A)
  • Burlington Performing Arts Centre Update (September 2010) (DI-9-10, Appendix A)
  • Burlington Performing Arts Centre Update (April 2010) DI-06-10
    Burlington Performing Arts Centre Update (January 2010) Report DI-2-10
  • Burlington Performing Arts Centre Update (November 2009) Report DI-17/09
  • Burlington Performing Arts Centre, Architect Report
  • Burlington Performing Arts Centre – Design Development Update Report DI-9-08
  • Burlington Performing Arts Centre - Conceptual Design Options Report DI-1/08
  • Award for Request for Proposal #RFP 13-07 Professional Project Management Services for Burlington Performing Arts Centre PR-30/07

Energy Saving Measures

  • Roof Heat Island Effect: use roofing material having high Solar Reflectance Index equal to or greater than 78 for a low-sloped roof or 29 for a steep-sloped roof for a minimum of 75% of roof area or install a vegetated roof for a minimum of 50% of the roof area
  • Optimize energy performance

Water Saving Measures

  • Reduce potable water use by 20%

Waste Management /Reduction

  • Waste management plan
  • Divert 50% of construction, demolition, and land-clearing waste from a landfill by recycling/salvaging materials
  • Use 7.5% recycled materials in construction

Other

  • Environmental community leadership
  • CO2 monitoring system
  • Temperature and humidity monitoring
  • Green housekeeping program

[Top] [Printer-Friendly Page]