Performing Arts Centre
Background Information:
-
Target: LEED Certified
-
Occupancy: summer 2011
-
Location: Southwest corner of Elgin and Locust Streets
-
City of Burlington webpage regarding project
Relevant Reports:
-
Report providing an update on the Burlington Performing Arts Centre construction project. (DI-10-11)
-
Burlington Performing Art Centre Update (June 2011) (DI-7-11)
-
Burlington Performing Art Centre Update (January 2011) (DI-1-11, Appendix A)
-
Burlington Performing Arts Centre Update (September 2010) (DI-9-10, Appendix A)
-
Burlington Performing Arts Centre Update (November 2009) Report DI-17/09
-
Burlington Performing Arts Centre, Architect Report
-
Burlington Performing Arts Centre – Design Development Update Report DI-9-08
-
Burlington Performing Arts Centre - Conceptual Design Options Report DI-1/08
-
Award for Request for Proposal #RFP 13-07 Professional Project Management Services for Burlington Performing Arts Centre PR-30/07
Energy Saving Measures
-
Roof Heat Island Effect: use roofing material having high Solar Reflectance Index equal to or greater than 78 for a low-sloped roof or 29 for a steep-sloped roof for a minimum of 75% of roof area or install a vegetated roof for a minimum of 50% of the roof area
-
Optimize energy performance
Water Saving Measures
-
Reduce potable water use by 20%
Waste Management /Reduction
-
Waste management plan
-
Divert 50% of construction, demolition, and land-clearing waste from a landfill by recycling/salvaging materials
-
Use 7.5% recycled materials in construction
Other
-
Environmental community leadership
-
CO2 monitoring system
-
Temperature and humidity monitoring
-
Green housekeeping program


